Our BulletBrace cable restraint solution offers contractors labor savings in more ways than one.
Besides the adjustability factor, another way Vibro-Acoustics provides labor savings is by leveraging the V-Anchor Engineering installation method. V-Anchor Engineering requires fewer anchors and kits when restraining suspended equipment, piping, ductwork and conduit. This installation method significantly saves contractors time and production costs. Below are some examples of the savings that can be achieved with V-Anchor Engineering.
V-Anchor Engineering Labor Savings Examples
Single Hung Pipe
Others
7kits
14anchors
2clamps
112min
Vibro-Acoustics
5kits
10anchors
5clamps
80min
Labor Savings
32mins!
Save up to 64 hours for large building projects with approx. 600 kits.
Trapeze Duct/Pipe
Others
10kits
20anchors
160min
Vibro-Acoustics
5kits
10anchors
80min
Labor Savings
80mins!